[email protected]
  1. Home
  2.  >> Nfc Chambishi Mine South East Ore Body Project Site

Nfc Chambishi Mine South East Ore Body Project Site

If you are interested in our company's products, we welcome your consultation 7/24 hours, and we are committed to creating the most suitable solution for you.

The Preparation Work of North Ventilation Shaft at The North Ventilation Shaft Project is located in MUKULUMPE farm 6 km southeast of Chambishi Copper Mine north to N1 of southeastern ore body The shaft is 1240 m in elevation 995 m in depth with an excavating diameter of 71 m and net diameter of 65 m and 300 mm concrete support C20 intensity grade The planned construction period is

  • Direct deal
  • Quality assurance
  • Worry free service